MVA / Mikelic Vres Arhitekti constructs a production and office building located in Dubrovčan, a village northwest of Zagreb, Croatia, characterized by a rural and natural landscape. Situated in an environment that is rapidly transforming into a small business and industrial complex, the plot was originally used as a construction waste landfill. By remediating the landfill, the plot is revived, creating a new topography, a new nature. Following the land’s natural slope, three mounds are formed on the site, defining the central space and pedestrian access paths. Technical, production, and shared spaces are arranged within the mounds, oriented toward the pedestrian path that connects them. A horizontal disk is anchored in this unstable context. A simple single-story volume with a square floor plan, organized around a central circular atrium, is positioned on three greened mounds. Both neutral and specific, the building draws the natural landscape in, creating unexpected spatial sequences.

horizontal disk anchors office building by MVA on three greened mounds near zagreb
all images by Jure Živković

 

 

transparent surfaces enhance connection with outdoor space

 

The interior of the disk is organized as a dynamic, horizontal working environment, consisting of office spaces of different types and characters. The design team at MVA / Mikelic Vres Arhitekti uses a sequence of plans and transparent surfaces to enhance user interactions and intensive relations with the outdoor space. Along the outer facade, closed offices are arranged with corner meeting rooms and niches for group work, opening the central space towards the landscape. Wrapped around the atrium, this main communication space contains the entrance, reception, hot desk workstations, a circular presentation hall, and a small auditorium, which extends toward the multifunctional common space and outdoor terrace in the basement. A spiral staircase connects this space with a small rooftop pavilion, terrace, and running track.

horizontal disk anchors office building by MVA on three greened mounds near zagreb
a production and office building emerges from a remediated landfill in rural Croatia

 

 

MVA links two concrete slabs with peripheral V-shaped columns

 

The Production and Office Building’s structural system consists of two prestressed concrete slabs connected by a series of peripheral V-shaped columns, four reinforced concrete cores, and freely positioned groups of inclined columns. The large structural spans allow for flexible space organization with lightweight, non-load-bearing, and demountable partitions. The building by MVA / Mikelic Vres Arhitekti creates its own context, simultaneously creating a dialogue with the surrounding nature and the newly built neighboring environment. With the continuous landscape extending beneath the building, the atrium becomes the central point of both the interior and exterior spaces, blurring the boundaries between them.

horizontal disk anchors office building by MVA on three greened mounds near zagreb
a horizontal concrete disk anchors the building in its evolving industrial setting

mva-mikelic-vres-arhitekti-production-office-building-dubrovcan-zagreb-croatia-designboom-1800-2

three grassy mounds shape the site, following the land’s natural slope

horizontal disk anchors office building by MVA on three greened mounds near zagreb
the central pedestrian path defines movement between the greened topography

mva-mikelic-vres-arhitekti-production-office-building-dubrovcan-zagreb-croatia-designboom-1800-3

a circular atrium forms the heart of the square-plan building

horizontal disk anchors office building by MVA on three greened mounds near zagreb
a circular presentation hall wraps around the central atrium

mva-mikelic-vres-arhitekti-production-office-building-dubrovcan-zagreb-croatia-designboom-1800-4

closed offices and corner meeting rooms face the surrounding landscape

horizontal disk anchors office building by MVA on three greened mounds near zagreb
offices and shared spaces are embedded within the mounds, opening to the outside

horizontal disk anchors office building by MVA on three greened mounds near zagreb
peripheral V-shaped columns support the prestressed concrete slabs

horizontal disk anchors office building by MVA on three greened mounds near zagreb
the atrium anchors light, movement, and connection at the building’s core

 

1/9
 
 
 
 
exploded axonometric
exploded axonometric
masterplan
masterplan
ground floor plan
ground floor plan
first floor plan
first floor plan
sections
sections

project info:

 

name: Production and Office Building Dubrovcan
architect: MVA / Mikelic Vres Arhitekti | @mva.hr

design team: Marin Mikelić, Tomislav Vreš, Mia Kos, Fran Stanić
collaborators: Barbara Horvatić, Anita Kovačić, Maja Pijaca, Marin Ševo

client: MDK Građevinar

location: Dubrovčan, Zagreb, Croatia

photographer: Jure Živković | @jure_zi

 

 

designboom has received this project from our DIY submissions feature, where we welcome our readers to submit their own work for publication. see more project submissions from our readers here.

 

edited by: christina vergopoulou | designboom

KEEP UP WITH OUR DAILY AND WEEKLY NEWSLETTERS
suscribe on designboom
- see sample
- see sample
suscribe on designboom

architecture in croatia (40)

renovation and restoration architecture and design (984)

where people work (936)

X
5