BLUETUBE TEMPORARY BAR by Collective DOSE from portugal
designer's own words:
Horizontally, the given intervention area was limited to a 3x3m square, whilst vertically the construction should not exceed 5m high. Constrained by the restricted budget, the requested functional device/building should nonetheless emphasize, by its materiality, an outstanding alluring outcome.
When applying the TUBE-IT system, the elected main material - the corrugated tube - is rolled up around a given existing metallic structure in a helicoid manner. In addition to its structural purpose - i. e. to attach the different tube layers to each other as well as to the structure itself - the plastic clamps enhance the desired visual impact of the whole.
This kind of tube, usually used in construction with an infrastructural role, becomes the design’s primary element.
Conceptually such an approach departs from a system of modular repetition and explores the continuity of a single element. The building process - managed “in situ” – stressed out and demonstrated both feasibility and versatility of the developed system, reinforcing at the same time the idea that it may just as well be capable of hosting a diversity of other spatial and constructive challenges.
global perspective
side photo
photo by night
day/night concept
concept diagram
Section and Detail