monovolume architecture: hydroelectric power plant punibach
‘hydroelectric power plant punibach’ by monovolume architecture, planeiler alm, italy
all images courtesy of monovolume architecture

 

 

hidden within the delicate landscape, italian practice monovolume architecture‘s ‘hydroelectric power plant punibach’
engineered by SEL AG, converts natural forces into useful energy while maintaining an artfully low profile in the alpine environment.
a rather simple solution was found for a space full of loud, bulky machinery while visually making an inconsequential impact of the site.
a free-flowing concrete structure peels out of the hills, opening a fissure in the hillside supporting a green roof that camouflages the
otherwise industrial building. thin wood planks of varying sizes are revealed in this split in the ground plane to form a lamellar wall,
where the warm light from the interior glows in the pitch-dark surroundings.

 

 

monovolume architecture: hydroelectric power plant punibach
view form alpine forest

 

 

monovolume architecture: hydroelectric power plant punibach

 

 

monovolume architecture: hydroelectric power plant punibach

 

 

monovolume architecture: hydroelectric power plant punibach
entrance

 

 

monovolume architecture: hydroelectric power plant punibach
wood facade connection to roof plane

 

 

monovolume architecture: hydroelectric power plant punibach
curvilinear roof form

 

 

monovolume architecture: hydroelectric power plant punibach
slits in the wood plank wall emits a warm glow

 

 

monovolume architecture: hydroelectric power plant punibach
view towards the access road

 

 

monovolume architecture: hydroelectric power plant punibach
free-flowing concrete form

 

 

monovolume architecture: hydroelectric power plant punibach
door detail

 

 

monovolume architecture: hydroelectric power plant punibach

 

 

monovolume architecture: hydroelectric power plant punibach
interior machinery

 

 

monovolume architecture: hydroelectric power plant punibach
large light-filled interior

 

 

monovolume architecture: hydroelectric power plant punibach
floor plan / level 0

 

 

monovolume architecture: hydroelectric power plant punibach
section

 

 

monovolume architecture: hydroelectric power plant punibach
section

 

 

project info:

 

 

client: puni energie gmbh (ltd.)
location: planeiler alm (bz) – south tyrol – italy
programme: hydroelectric power station
realisation: 2010/11
pressure pipeline length: 4.115 m
turbines: 2 horizontal pelton
average annual production: 14,3 mil. kwh
construction cost: 9,0 mil. euros